Drilled, Tubular Steel Piles
A major redevelopment in Annalong harbour involved the drilling and installation of 12m long 457mm diameter heavy wall steel tubes into rock.
The piles were to provide support for a new floating pontoon.
Completed:- June 2001
Client:- Joint Venture - Kelly/Herron
Engineer:- Kirk McClure Morton
