Odex Piles
Odex piles are formed by drilling and hammering a steel casing into the ground. The drilling is done with a down the hole hammer that has the capacity to drill through obstructions and into solid rock. This borehole can then be continued in the rock as an open hole. Concrete is then pumped in to the hole and a steel cage can be installed. The steel casing can either be removed or left in place.
